Skip to content
  • (413) 834-4284
  • [email protected]
  • 21 Grinnell St, Greenfield, Massachusetts
Sprawl-busters
  • Home
  • About
  • Resources
    • Links
    • Books
    • Movies
    • Home Towns, Not Home Depot
    • The Case Against Sprawl
  • Victories
  • Blog
    • Share Your Battle
  • Contact
  • Home
  • About
  • Resources
    • Links
    • Books
    • Movies
    • Home Towns, Not Home Depot
    • The Case Against Sprawl
  • Victories
  • Blog
    • Share Your Battle
  • Contact
  • Uncategorized

Wal-Mart Developer Gets Stuck In His Own Traffic Jam.

  • Al Norman
  • June 28, 2005
  • No Comments

A California developer has gotten stuck in his own bumper-to-bumper traffic. Those pesky citizens in Temecula, California have been wreaking havoc on the timetable of a big box developer. Citizens taking legal action has made it impossible for a developer to get past the red light. A judge in Riverside County has ruled that a 150,000 s.f Wal-Mart development in Vail Ranch did not do a proper traffic study, and must now go back and redo the study. According to the Californian newspaper, Judge Dallas Holmes has stymied the Wal-Mart project twice in the past couple of years, in response to road capacity issues raised in legal action by the group Citizens First of Temecula Valley. The total project is 428,000 s.f., and is being proposed by developer Price Legacy, based in San Diego. The County Board of Supervisors gave the project a green light last summer, but Citizens First took them to court. The project, called Rehhawk Towne Center, encompasses 47 acres just outside of Temecula. Citizens First says the court ruling last week requires further construction work on the project to cease until another environmental impact study is conducted. According to local residents, the huge project includes a Kohl’s discount store as well as Wal-Mart. ” We’re also getting a Kohl’s along with the proposed supercenter,” one member of the group told Sprawl-Busters. “The Kohl’s was built in 4 months — during the court hearing period.?? The developer started the building of it and a Ross Dress for less and several other stores while we were waiting to go to court.?? Talk about arrogance and fast tracking.” ?? As a sweetener, the developer is planning to restore a 4 acre Vail Ranch site, which includes several historic buildings. But the offer is not as sweet as it appears, since the county has offered to use public tax dollars to help the city of Temecula pay for the $9 million restoration price tag, so the project is actually a form of corporate welfare, with Price Legacy only paying for part of the project. Citizens say the Wal-Mart scale is too large for the local roads, and note that the project would allow the company to expand the store by another 74,702 s.f. as proposed. Citizens First has asked Price Legacy to shrink the size of the store — something the developer has been unwilling to consider. The court ruling said the developer has to extend his traffic impact statement to cover longer than a one year timeframe, including a 20 year outlook. Citizens First filed their first lawsuit against this project back in 2000, again over the issue of inadequate traffic studies. The two rulings from Riverside County Superior Court mean that this timeline has now stretched for almost two and a half years.

For more information on the gridlock in Temecula, contact [email protected]

Like this article?

Share on Facebook
Share on Twitter
Share on Linkdin
Share on Pinterest
Picture of Al Norman

Al Norman

Al Norman first achieved national attention in October of 1993 when he successfully stopped Wal-Mart from locating in his hometown of Greenfield, Massachusetts. Almost 3 decades later they is still not Wal-Mart in Greenfield. Norman has appeared on 60 Minutes, was featured in three films, wrote 3 books about Wal-Mart, and gained widespread media attention from the Wall Street Journal to Fortune magazine. Al has traveled throughout the U.S., Barbados, Puerto Rico, Ireland, and Japan, helping dozens of local coalitions fight off unwanted sprawl development. 60 Minutes called Al “the guru of the anti-Wal-Mart movement.”

Leave a comment

Find Us

  • 21 Grinnell St, Greenfield, MA
  • (413) 834-4284
  • [email protected]

Helpful Links

  • Terms
  • Privacy Policy
  • Cookie Policy
  • Terms
  • Privacy Policy
  • Cookie Policy

Recent Posts

Facebook testing encrypted chat backups – CNBC

September 14, 2022

Facebook is shutting down its live shopping feature on October 1 – TechCrunch

September 14, 2022

Introducing Home and Feeds on Facebook – Facebook

September 14, 2022

Facebook to allow up to five profiles tied to one account – Reuters

September 14, 2022

Facebook tells managers to identify low performers in memo – The Washington Post

September 14, 2022

Meta is dumping Facebook logins as its metaverse ID system – TechCrunch

September 14, 2022

Introducing Features to Quickly Find and Connect with Facebook Groups – Facebook

September 14, 2022

Facebook plans ‘discovery engine’ feed change to compete with TikTok – The Verge

September 14, 2022

Wow, Facebook really knows how to give someone a send-off! – TechCrunch

September 14, 2022

Here’s What You Need to Know About Our Updated Privacy Policy and Terms of Service – Facebook

September 14, 2022

Recent Tweets

Ⓒ 2020 - All Rights Are Reserved

Design and Development by Just Peachy Web Design

Download Our Free Guide

Download our Free Guide

Learn How To Stop Big Box Stores And Fulfillment Warehouses In Your Community

The strategies written here were produced by Sprawl-Busters in 2006 at the request of the United Food and Commercial Workers (UFCW), mainly for citizen groups that were fighting Walmart. But the tips for fighting unwanted development apply to any project—whether its fighting Dollar General, an Amazon warehouse, or a Home Depot.

Big projects, or small, these BATTLEMART TIPS will help you better understand what you are up against, and how to win your battle.